| HomeDemolition & RedevelopmentProjectsConsultancy ServicesCommercialGalleryAbout
Us Contact UsLinksDefinitions & Procedures |
|
Project Works
Cleared sites for full demolition
These projects include the full site isolation of all cabled services including power, BT and other communication and network companies equipment:
(Red Indicates current projects)
•St Ebbas Hospital, Epsom
•Queen Mary’s Hospital, Rowhampton
•Meanee Barracks, Colchester
•Hyderabad Barracks, Colchester
•Goojerat Barracks, Colchester
•Roman Barracks Colchester
•Teardrop Site, Woolwich Arsenal
•3M Building, Bracknell
•Spring Gardens, Romford
•Block 1 Lethbridge Estate Lewisham
•Abridge Estate, Barking
•Phase 1, Kidbrooke Estate
•Oaklands College, St Albans
•2–48 Cornmill Lane, Lewisham
•Old Government Buildings, Guildford Road, Woking
•Bishop Ramsey School, Ruislip
•6 industrial units, Blackthorne Crescent, Poyle
•Buckinghamshire Chilterns University College, High Wycombe
•Rentokil, East Grinstead
•Hewlett Packard, Imperial Way, Reading
Soft Strip / Demolition preparation with retained services
These projects include isolating for soft stripping / demolition whilst identifying and protecting retained services or equipment such as telephone masts, lifts and pumps.
•23 Finsbury Square London
•4 Tudor Street London
•West Park Hospital, Epsom
•3 Finsbury Square, London
•10 Finsbury Square, London
•Kings Reach Tower, London
•20 Chesham Place, London
•130 City Road, London
•Slough Bus Garage, Slough
•Mreal, Sittingbourne
•Graylingwell Hospital, Chichester
Projects with attendance times under 10 days have not been included.
|