HomeDemolition & RedevelopmentProjectsConsultancy ServicesCommercialGalleryAbout Us Contact UsLinksDefinitions & Procedures  

Project Works

Cleared sites for full demolition

These projects include the full site isolation of all cabled services including power, BT and other communication and network companies equipment:

(Red Indicates current projects)

St Ebbas Hospital, Epsom

•Queen Mary’s Hospital, Rowhampton

Meanee Barracks, Colchester

Hyderabad Barracks, Colchester

Goojerat Barracks, Colchester

Roman Barracks Colchester

•Teardrop Site, Woolwich Arsenal

•3M Building, Bracknell

•Spring Gardens, Romford

•Block 1 Lethbridge Estate Lewisham

•Abridge Estate, Barking

•Phase 1, Kidbrooke Estate

•Oaklands College, St Albans

•2–48 Cornmill Lane, Lewisham

•Old Government Buildings, Guildford Road, Woking

•Bishop Ramsey School, Ruislip

•6 industrial units, Blackthorne Crescent, Poyle

•Buckinghamshire Chilterns University College, High Wycombe

•Rentokil, East Grinstead

•Hewlett Packard, Imperial Way, Reading

Soft Strip / Demolition preparation with retained services

These projects include isolating for soft stripping / demolition whilst identifying and protecting retained services or equipment such as telephone masts, lifts and pumps.

•23 Finsbury Square London

•4 Tudor Street London

West Park Hospital, Epsom

3 Finsbury Square, London

10 Finsbury Square, London

Kings Reach Tower, London

•20 Chesham Place, London

•130 City Road, London

Slough Bus Garage, Slough

Mreal, Sittingbourne

•Graylingwell Hospital, Chichester

Projects with attendance times under 10 days have not been included.